Downloads: D10.2 Validation Report for SDK Prototype
D10.2 Validation Report for SDK Prototype 1.1 | ||||
This deliverable provides the results of the first iteration validation phase focussing on the SDK prototype. The objective is to show the major outcomes found after applying the validation concepts described in the Deliverable 10.1 “Validation Plan for prototypes” in order to better understand the middleware and SDK prototype and be able to feed the lessons learnt back into the next development iteration. The validation tests have been fulfilled during the implementation phase and in a specific testing activity and it involved both the first Hydra prototypes (SDK) but also the middleware which is under continuous development. |
| |||
Download: (1.4 MB) |
Downloads: 100 Downloaded: 243958 Most Downloaded: A Survey of Context-aware Middleware [ 8823 ] Most Recent: Hydra - LinkSmart brochure [ 3474 ] |