The Hydra project has planned an extensive series of deliverables documenting the project results. A large number of these deliverables are available to the public and can be downloaded here.
The following list containts deliverables planned up to and including M50 of the project.
Deliverable No [1] |
Deliverable title | Delivery date [2] |
Nature [3] |
Dissemination level [4] |
Status |
D1.1 | Project Initiation Document | M1 | R | CO | Finished |
D1.2 | Quality Manual | M4 | R | RE | Finished |
D1.3 | Draft 12-month progress and financial report | M8 | R | CO | Finished |
D1.4a | 12-month progress and financial report | M12 | R | CO | Finished |
D1.4b | 12-month progress and financial report | M24 | R | CO | Finished |
D1.4c | 12-month progress and financial report | M36 | R | CO | Finished |
D1.5 | Quarterly progress reports for the commission | M15+3 | R | RE | Ongoing |
D2.1 | Scenarios for usage of HYDRA in 3 different domains | M5 | R | PU | Download |
D2.2 | Initial technology watch report | M2 | R | PU | Download |
D2.3 | Initial regulatory-standards watch report | M2 | R | PU | Download |
D2.4 | Initial market watch report | M2 | R | CO | Finished |
D2.5 | Initial requirements report | M5 | R | RE | Finished |
D2.6 | Validation framework | M9 | R | RE | Finished |
D2.7 | Updated requirements report | M30, M42 | R | PU | Download |
D2.8 | Updated watch report | M18, M30 | R | PU | Download |
D2.9 | Requirements engineering process revisited | M27 | R | CO | Finished |
D2.10 | Change request and re-engineering report cycle 2 | M27 | R | CO | Finished |
D2.11 | Change request and re-engineering report from 3 | M39 | R | CO | Finished |
D3.1 | Existing applications, services, devices and standards | M5 | R | PU | Download |
D3.2 | Updated systems requirement report | M12+6 | R | RE/PU | Finished |
D3.3 | Draft of architectural design specification | M8 | R | RE | Finished |
D3.4 | Initial architectural design specification | M18 | R | PU | Download |
D3.5 | Update of existing applications, services, devices, etc. | M19 | R | RE | Finished |
D3.6 | Data Acquisition Component Report | M20 | R | RE | Finished |
D3.7 | Grid Architecture Report | M21 | R | RE | Finished |
D3.8 | Context Awareness Report | M21 | R | RE | Finished |
D3.9 | Updated System Architecture Report | M22, M34 | R | RE | Finished |
D3.10 | Final Data Acquisition Report | M32 | R | RE | Finished |
D3.11 | Final Context Awareness Report | M32 | R | RE | Finished |
D3.12 | Updated Grid Architecture Report | M32 | R | RE | Finished |
D3.13 | Application Developer Tools Report | M42 | R | RE | Finished |
D3.14 | Device Developer Tools Report | M42 | R | RE | Finished |
D3.15 | Final System Architecture Report | M46 | R | RE | Finished |
D3.16 | Final Context Awareness Report | M44 | R | RE | Finished |
D3.17 | Final Grid Architecture Report | M44 | R | RE | Finished |
D4.1 | Technical requirements specification | M10 | R | PU | Download |
D4.2 | Embedded service SDK prototype and report | M18, M24 | R | PU | Download |
D4.3 | Self-* properties SDK prototype and report | M19, M30 | P | CO | Finished |
D4.4 | Embedded AmI components prototype | M20, M30 | P | CO | Finished |
D4.5 | QoS-enabled Hydra middleware | M24 | P | CO | Finished |
D4.7 | Embedded Service DDK prototype and report | M36 | P | PU | Download |
D4.8 | Self-* properties DDK prototype and report | M30 | P | PU | Download |
D4.9 | Embedded AmI components prototype | M44 | P | PU | Download |
D4.10 | QoS Enabled Hydra middleware | M32 | P | PU | Download |
D4.11 | Consolidated Embedded Architecture Report | M50 | P | PU | Download |
D5.1 | Communication infrastructure requirements | M7 | R | RE | Finished |
D5.2 | Wireless communications | M12 | P | RE | Finished |
D5.3 | Draft of Wireless Network Implementation Description | M18 | R | RE | Finished |
D5.4 | Draft of Wireless Devices Integration Description | M18 | R | RE | Finished |
D5.5 | Device-to-Device Communication | M18 | R | RE | Finished |
D5.6 | Draft of Network Security Implementation Description | M18 | R | RE | Finished |
D5.7 | Wireless Network SDK Prototype | M20 | P | RE | Finished |
D5.8 | Draft of wireless device discovery and testing environ | M27 | R | RE | Finished |
D5.9 | Draft of wireless network DDK description | M29 | R | RE | Finished |
D5.10 | Wireless network DDK prototype | M32 | P | RE | Finished |
D5.11 | Draft of wireless network IDE description | M42 | R | RE | Finished |
D5.12 | Hydra Wireless networks and devices, Final Report | M50 | R | RE | Finished |
D6.1 | Quality Attribute Scenarios – technical requirements | M17, M29 | R | RE | Finished |
D6.2 | MDA Design Document | M18 | R | PU | Download |
D6.3 | Semantic Web Services Design document | M18 | R | PU | Download |
D6.4 | Ontologies Prototype | M20 | P | RE | Finished |
D6.5 | SoA middleware components prototype | M20 | P | RE | Finished |
D6.6 | Updated MDA design document | M36 | R | PU | Download |
D6.7 | Ontologies maintenance/update tools prototype | M32 | P | RE | Finished |
D6.8 | SoA middleware components for DDK prototype | M32 | P | RE | Finished |
D6.9 | Device Ontologies maintenace/update tools prototype | M44 | P | RE | Finished |
D6.10 | SoA middleware components for the IDE prototype | M44 | P | RE | Finished |
D6.11 | Hydra SOA and Model-Driven Architecture, Final Report | M50 | R | RE | Finished |
D7.1 | Updates of security requirement specification | M17, M28 | R | RE | Finished |
D7.2 | Updates of virtualisation requirement specification | M12 | R | RE | Finished |
D7.3 | Security architectural models design specification | M20 | R | RE | Finished |
D7.4 | Enhanced Prototypes of security & privacy managers | M22 | P | RE | Finished |
D7.5 | Hydra Security Meta Model (update of D7.2) | M23 | R | RE | Finished |
D7.6 | Impact of architectural security implications | M24 | R | RE | Finished |
D7.7 | Security architectural models design specification | M36 | R | RE | Finished |
D7.8 | Security and privacy components for DDK prototype | M32 | R | RE | Finished |
D7.9 | Hydra security meta model (upd. D7.5) | M34 | R | RE | Finished |
D7.10 | Security and Privacy component for IDE prototype | M44 | P | RE | Finished |
D7.11 | Security in networked embedded systems | M50 | R | RE | Finished |
D8.1 | Test Plan | M10 | R | RE | Finished |
D8.2 | Integration Plan | M20 | R | RE | Finished |
D8.3 | Integrated Platform for SDK Demonstrator | M22 | P | RE | Finished |
D8.4 | Integrated prototype platform for DDK demonstrator | M34 | P | RE | Finished |
D8.5 | Semi-annual integration and quality assurance report | M36+6 | R | RE | Finished |
D8.6 | Integrated Platform and Report for IDE Prototype | M46 | R | RE | Finished |
D9.1 | Hydra middleware development platform | M8 | P | CO | Finished |
D9.2 | Building Automation domain requirements | M8 | R | PU | Download |
D9.3 | Healthcare domain requirements | M12 | R | PU | Download |
D9.4 | Agriculture domain requirements | M12 | R | PU | Download |
D9.5 | Proof of concept demonstrator | M12 | P | CO | Finished |
D9.6 | SDK Demonstrator | M24 | R | CO | Finished |
D9.7 | DDK Prototype Applications and Report | M36 | R | RE | Finished |
D9.8 | IDE Prototype Applications and Report | M48 | P | RE | Finished |
D10.1 | Validation Plan for Demonstrators | M20 | R | PU | Download |
D10.2 | Validation Report for SDK Demonstrator | M26 | R | PU | Download |
D10.3 | Validation Report for DDK Demonstrator | M38 | R | PU | Download |
D10.4 | Validation Report for IDE Demonstrator | M48 | R | PU | Download |
D10.5 | Business modelling concepts | M18 | R | RE | Finished |
D10.6 | Business models in Building Automation | M42 | R | PU | Download |
D10.7 | Business models in Healthcare | M32 | R | PU | Download |
D10.8 | Business models in Agriculture | M44 | R | PU | Download |
D12.1 | Internal technology workshops teaching material | M4 | R | RE | Finished |
D12.2 | External developers workshops teaching material | M18 | R | PU | Download |
D12.3 | External business modelling teaching material | M24 | R | PU | Download |
D12.4 | Combined Internal Training Material | M24 | R | RE | Finished |
D12.5 | External developers workshops teaching material | M30 | R | PU | Download |
D12.6 | Scenario thinking training | M36 | R | PU | Download |
D12.7 | Business modelling workshop teaching materials II | M40 | R | PU | Download |
D12.8 | Final Combined Internal Training materials | M44 | R | PU | Download |
D12.9 | Final External developers teaching materials | M46 | R | PU | Download |
D12.10 | Ethical considerations in the design of Hydra enabled services and applications | M46 | R | PU | Download |
D13.1 | Project website | M3 | P | PU | Download |
D13.2 | Dissemination strategy | M6 | R | PU | Download |
D13.3 | Dissemination coordination platform | M6 | P | RE | Finished |
D13.4 | Plans for contribution to standardisation work | M12 | R | PU | Download |
D13.5 | First draft of exploitation strategy Updated | M12 | R | CO | Finished |
D13.6 | Updated dissemination strategy | M18 | R | PU | Download |
D13.7 | Intermediate Dissemination and feedback report | M18 | R | PU | Download |
D13.8 | Updated Exploitation Strategy | M21 | R | RE | Finished |
D13.9 | Report on projects connected to Hydra | M24 | R | PU | Download |
D13.10 | Intermediate Standardisation Report | M30 | R | CO | Finished |
D13.11 | Intermediate standardisation report | M42 | R | CO | Finished |
D13.12 | Update exploitation strategy (implementation) | M48 | R | CO | Finished |
D13.13 | Report on scientific dissemination and incorporation of Hydra middleware in the real world application | M52 | R | CO | Finished |
[1] Deliverable numbers in order of delivery dates: D1.1 – D13.10
[2] Month in which the deliverables will be available. Month 0 marking the start of the project, all delivery dates relative to start date.
[3] The nature of the deliverable using one of the following codes: R = Report - P = Prototype - D = Demonstrator - O = Other
[4] The dissemination level using one of the following codes: PU = Public PP = Restricted to other programme participants (including the Commission Services). RE = Restricted to a group specified by the consortium (including the Commission Services). CO = Confidential, only for members of the consortium (including the Commission Services).